Equipment Workflow
active
Total logged
20h 30m
Uninvoiced
0h 0m
Entries
3
Invoices
0
Time by team member
| Team member | Entries | Hours |
|---|---|---|
| Tash Gromek | 2 | 16h 0m |
| Caleb Harvey | 1 | 4h 30m |
Recent time entries
Last 3
| Date | Description | Who | Duration | Status |
|---|---|---|---|---|
| 22 Jan 2025 | New Asset with Blank Checklist - Change the adding of assets to show cards in a 3 step process - Script these steps to filter each portal down based on the system and measure shown for the equipment - Add a loop on for if the user selects a portal item or hits the back/exit button and script these changes to reloop or cancel loop - Add a new button called "New" to the equipment page which adds a n equipment against the system and measure selected - Script this system and measure against the new equipment and add the blank checklist against it - On a job, create a new asset against this new equipment created and bring through the default checklist - Ensure all new fields and relationships are working correctly - Success | Caleb Harvey | 4h 30m | invoiced |
| 5 Dec 2024 | Finalised push of inspection type linkage to equipment level. - Added Category, Type and association of parts to equipment. | Tash Gromek | 8h 0m | invoiced |
| 4 Dec 2024 | Meeting with TH Streamline Equipment flow into structure discussed. | Tash Gromek | 8h 0m | invoiced |
Edit